FOLLOW-UP INSPECTION
Follow-up inspection to the routine inspection conducted on 3/12/26. On site to verify that 3 door preparation cooler has been repaired. Observations: -Ambient temperature of preparation cooler measured 40F. -PHFs stored in preparation cooler measured 41F or below.