FOLLOW-UP INSPECTION
Follow-up inspection to routine inspection conducted on 2/26/2026. All phf's at the cook line held at 41 F or below and 135 F or above. Observed proper cooling practices. The cook line hand wash sink drain is free flowing. Observed installation taking place of two hand wash sinks, dump sink and a mop sink. Call for a final inspection by the plan check department when work has been completed.