98
Latest score
100%
Pass rate
3
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Jun 25, 2026ROUTINE INSPECTION51 days ago

Inspection Timeline

Jun 25, 2026Latest
PassedScore: 98/100
ROUTINE INSPECTION
98
Nov 24, 2025
PassedScore: 95/100
ROUTINE INSPECTION
95
Jun 18, 2025
PassedScore: 98/100
ROUTINE INSPECTION
98

Violations Analysis

0
Critical Violations
4
Non-Critical
4
Total Violations
Across 3 inspections

Complete inspection history

3 inspections
PassLatest Jun 25, 2026
98/100

ROUTINE INSPECTION

1 reported violation
  • K45: Floor, walls, ceilings: built,maintained, clean

    Observed the floor to be missing grout in and/or coming off of the wall in some places. The FRP is coming off of the wall near the back drive up window. [CA] Repair the wall and floor.

Pass Nov 24, 2025
95/100

ROUTINE INSPECTION

2 reported violations
  • K21: Hot and cold water available

    The mens hand sink does not have cold water when the cold is turned on. At this time only the hot is working. [CA] The hot and cold must be functioning at the hand sink.

  • K40: Wiping cloths: properly used, stored

    The towel bucket quat sanitizer near the registers was at 100ppm. [CA] Be sure to keep the sanitizer at 200ppm quat. [COS] Employee changed sanitizer to 200ppm quat.

Pass Jun 18, 2025
98/100

ROUTINE INSPECTION

1 reported violation
  • K40: Wiping cloths: properly used, stored

    The wiping towels were checked at approximately 100ppm. [CA] The quat must be changed out often enough to keep at 200ppm. According tot he mgr it was going to be changed. Adjust time to change them out to keep it proper sanitizing levels and use the test strips to monitor.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.