94
Latest score
100%
Pass rate
1
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Aug 19, 2025ROUTINE INSPECTION361 days ago

Inspection Timeline

Aug 19, 2025Latest
PassedScore: 94/100
ROUTINE INSPECTION
94

Violations Analysis

0
Critical Violations
3
Non-Critical
3
Total Violations
Across 1 inspections

Complete inspection history

1 inspections
PassLatest Aug 19, 2025
94/100

ROUTINE INSPECTION

3 reported violations
  • K45: Floor, walls, ceilings: built,maintained, clean

    FREEZER COFFEE SPILL BEHIND THE DISPENSER. [CA] Clean the spill to maintain.

  • K38: Adequate ventilation/lighting; designated areas, use

    BURNED OUT BULB INSIDE THE WALK IN COOLER. [CA] Replace burned out bulb inside the walk in cooler. LACK EXHAUST FAN/VENT INSIDE THE RESTROOM. [CA] Restrooms shall have an openable screened window, an air shaft, or a light switch-activated exhaust fan, consistent with the requirements of local building codes.

  • K49: Permits available

    --48 HOUR NOTICE— Our records indicate this facility is operating without a valid permit and has a delinquent account. Your balance IS due. Payment must be made immediately to DEH at the address at the top of this report or via our website at www.Ehinfo.org. A facility that submits payment of the outstanding balance within 48 hours (2 business days) of this notice will be issued and mailed an operating permit by this department. Failure to comply within 48 hours will result in facility closure and additional enforcement, including but not limited to reinspection(s) and additional cost recovery fees. A facility found to be in continued operation without a permit may incur a penalty of three (3) times the operating permit fee, and fee(s) for re-inspection(s) charged at the current hourly rate approved by the Santa Clara County Board of Supervisors. Penalties and fees incurred due to enforcement activities must be paid in full prior to the issuance of an operating permit.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.