FOLLOW-UP INSPECTION
Re-inspection was conducted on this date to follow up on the closure initiated after the 5/8/26 inspection after failure to submit plans for the installation of the hand washing sink and three compartment sink. On this date project SR0885011 has been received and invoice is pending payment. As discussed with plan check, payment for invoice must be completed within 30 days, otherwise invoice will be canceled and the project closed as abandoned. Additional enforcement may follow if not completed. The impound for the following items have been lifted: JL05082026A: Hand washing sink, Model: 600HS12 JL05082026A: Three compartment sink with right drain board, Model: SE18183R Temporary authorization for use of the single drain board three compartment sink has been granted as this facility completes this construction project. It was discussed that warewashing shall be done in batches to accommodate the use of only one drain board. This facility's service volume is low and operation time is limited which supports the batch washing method. If at any time this cannot be conducted safely, this facility shall not operate. Facility okay to operate.