95
Latest score
100%
Pass rate
1
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Jun 6, 2025ROUTINE INSPECTION435 days ago

NOTE: Facility is undergoing construction on half of the food facility (confirmed they have gone through Plan Check). Partition construction zone from food storage and warewashing area with plastic or like material to protect food.

Inspection Timeline

Jun 6, 2025Latest
PassedScore: 95/100
ROUTINE INSPECTION
95

Violations Analysis

0
Critical Violations
2
Non-Critical
2
Total Violations
Across 1 inspections

Complete inspection history

1 inspections
PassLatest Jun 6, 2025
95/100

ROUTINE INSPECTION

NOTE: Facility is undergoing construction on half of the food facility (confirmed they have gone through Plan Check). Partition construction zone from food storage and warewashing area with plastic or like material to protect food.

2 reported violations
  • K21: Hot and cold water available

    Water temperature at 3 compartment warewash sink measured at 114F. [CA] Provide hot water at a minimum of 120F; repair/adjust water heater if necessary.

  • K35: Equipment, utensils: Approved, in good repair, adequate capacity

    Observed heavy build up of butter and grime in the back part of the popcorn machine. [CA] Thoroughly clean and sanitize popcorn machine on a regular basis.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.