PassLatest Dec 12, 2024
98/100ROUTINE INSPECTION
1 reported violation
- K41: Plumbing approved, installed, in good repair; proper backflow devices
Observed waste pipe under three compartment sink extending into the floor sink. [CA] All equipment that discharges liquid waste shall discharge through a waste pipe with an airgap of at least one inch or twice the diameter of waste pipe into a floor sink or other approved type of receptor.