100
Latest score
100%
Pass rate
4
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Mar 12, 2026ROUTINE INSPECTION156 days ago

Talking to PIC with regards to facility upgrading equipment on site. - A person proposing to build or remodel a food facility shall submit plans and specifications for review and shall receive plan approval prior to starting any new construction or remodeling. Contact DEH at 408-918-3400 or at www.ehinfo.org to obtain plan check requirements.

Inspection Timeline

Mar 12, 2026Latest
PassedScore: 100/100
ROUTINE INSPECTION
100
Sep 4, 2025
PassedScore: 98/100
ROUTINE INSPECTION
98
Feb 24, 2025
PassedScore: 100/100
ROUTINE INSPECTION
100
Oct 9, 2024
PassedScore: 97/100
ROUTINE INSPECTION
97

Violations Analysis

0
Critical Violations
2
Non-Critical
2
Total Violations
Across 4 inspections

Complete inspection history

4 inspections
PassLatest Mar 12, 2026
100/100

ROUTINE INSPECTION

Talking to PIC with regards to facility upgrading equipment on site. - A person proposing to build or remodel a food facility shall submit plans and specifications for review and shall receive plan approval prior to starting any new construction or remodeling. Contact DEH at 408-918-3400 or at www.ehinfo.org to obtain plan check requirements.

No reported violations
Pass Sep 4, 2025
98/100

ROUTINE INSPECTION

1 reported violation
  • K40: Wiping cloths: properly used, stored

    Spray bottle to sanitize surfaces was measured at 400PPM of quats at the time of inspection. [CA] Wiping towels shall be stored in sanitizing solution of an approved concentration when not in use (100 ppm - chlorine, 200 ppm - quaternary ammonium).

Pass Feb 24, 2025
100/100

ROUTINE INSPECTION

No reported violations
Pass Oct 9, 2024
97/100

ROUTINE INSPECTION

1 reported violation
  • K21: Hot and cold water available

    Hot water at the 3-compartment sink was measured at 111*F at the time of inspection. [CA] Hot water shall be supplied at a minimum temperature of at least 120°F measured from the faucet throughout facility except at hand wash sinks (100*F). [COS] Water heater was adjusted at the time of inspection. Re-measured at 120*F.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.