FOLLOW-UP INSPECTION
Note: This is a follow-up inspection from this morning's routine inspection. The facility was closed due to the lack of hot water supply on the hand and warewash facilities. During this follow-up inspection, a temporary water heater is installed below the manual three compartment warewash sink and temperature is now measured at 115 oF. Therefore, the facility is open for service. However, if the water heater replacement if not like for like, plan and specification of the new water heater must be submitted to our plan check service at dehplancheck@deh.sccgov.org or in person at our office address written on the top left corner of the this report.
1 reported violation
- K21: Hot and cold water available
The water temperature on the manual three compartment warewash sink was measured at 115 oF. The water temperature on the handwash station is measured at 85 oF. [CA] Please raise the water temperature on the manual warewash sink to 120 oF and on the handwash stations to 100 oF immediately.