FOLLOW-UP INSPECTION
Note: 1. This is a second follow-up inspection to the routine inspection that was conducted on 03/25/2026. During the first follow-up inspection conducted on 04/10/26, the bakery was found to be sharing a water heater with the Mercado San Jose grocey store. Therefore, the owner of the bakery was given a week to submit plan and specification to our office to install a dedicated water heater. However, the owner has not submitted yet. Therefore, I stopped by the facility to inquire the reason and issue another week extension for the owner to submit plan and specification to our office in person or via email at dehplancheck@deh.sccgov.org. If plan and specification is not submitted to our office by 6/5/2026, the permit to operate shall be suspended. 2. Since this is a second follow-up inspection, the owner shall get an invoice for $282.00
1 reported violation
- K35: Equipment, utensils: Approved, in good repair, adequate capacity
The bakery is sharing a water heater with the Mercado San Jose grocery store. [CA] Please install a dedicated water heater for the bakery. Plan and specification must be submitted by 6/5/26.