FOLLOW-UP INSPECTION
Follow- up inspection to the routine inspection conducted on 12/12/25. Facility was closed due to lack of hot water. Observations: -Hot water measured 106F throughout facility. -Hand wash station next to 3 compartment sink has been repaired. A work order will be placed to ensure hot water reaches a minimum of 120F throughout facility. Owner will be sending video of water temperature and paper towel dispenser in bar area by 12/26/25.
2 reported violations
- K21: Hot and cold water available
Hot water measured 106F throughout facility. [CA] Hot water shall be supplied at a minimum temperature of 120°F measured from the faucet throughout facility except at handwash sinks. Owner stated that a work order will be placed.
- K06: Adequate handwash facilities supplied, accessible
At the bar hand wash sink, paper towels are not stored in a dispenser. [CA] Provide a paper towel dispenser. Ensure paper towels are stored in dispenser at all times to prevent contamination.