FOLLOW-UP INSPECTION
Follow-up inspection to the routine inspection conducted on 10/2/25. On site to confirm refrigeration units have been repaired, bar hand wash sink is fully operable with cold and hot water available, and all potentially hazardous foods are held cold at 41F or below. Observations: -3 door display cooler and 4 drawer preparation cooler have been repaired - ambient temperature 38-39F -PHF's measured below 41F -Cold and hot water available at bar hand sink Note: Owner stated that roof leak has not been fully repaired. Roof was serviced on 10/14/25. Leak was observed again after rain storm. Landlord informed owner that roof will be serviced again by tomorrow: 10/20/25. Owner will be sending invoice and photos of roof repairs via email by 10/22/25.