FOLLOW-UP INSPECTION
-All equipment including prep table in back, shelving, in between refrigeration units/cooking equipment, floors have been cleaned. Openings found in ceiling have been sealed. -Monitoring traps noted and were set up throughout kitchen. Next pest control service is scheduled for next week. -Hot water temperature at 3 comp sink measured at >130F. -Light bulb installed at hood - Soap bottle and container with paper towels on shelf provided at cook line hand sink Facility has been re-opened and is ok to operate.