SUITE TOWER FINISHING KITCHEN - SOUTH-LEVEL 500

4900 MARIE P DEBARTOLO WY, SANTA CLARA, CA, 95054
Pass
100
Latest score
100%
Pass rate
3
Inspections
1
Critical violations

Location

Latest inspection

PASSED
Jun 16, 2026ROUTINE INSPECTION60 days ago

Routine inspection was conducted on site and report was written off site. An exit interview was conducted with the operator to address the inspection findings. The OIR was issued to e-mail address that was verified onsite. Joint inspection with Guillermo V.

Inspection Timeline

Jun 16, 2026Latest
PassedScore: 100/100
ROUTINE INSPECTION
100
Feb 8, 2026
Passed
RISK FACTOR INSPECTION
Aug 2, 2025
PassedScore: 100/100
ROUTINE INSPECTION
100

Violations Analysis

1
Critical Violations
1 in last 3 inspections
0
Non-Critical
1
Total Violations
Across 3 inspections

Complete inspection history

3 inspections
PassLatest Jun 16, 2026
100/100

ROUTINE INSPECTION

Routine inspection was conducted on site and report was written off site. An exit interview was conducted with the operator to address the inspection findings. The OIR was issued to e-mail address that was verified onsite. Joint inspection with Guillermo V.

No reported violations
Pass Feb 8, 2026
N/A

RISK FACTOR INSPECTION

A risk factor inspection is an inspection focusing on factors known to directly contribute to causing a foodborne illness. Structural issues and good retail practices are not assessed during this inspection. An exit interview was conducted with the operator to address the inspection findings. The OIR was issued to e-mail address that was verified onsite.

1 reported violation
  • K21: Hot and cold water availableCritical

    At the 3-compartment sink and the preparation sink, measured the maximum water temperature from 80-82F. [CA] Hot water shall be supplied at a minimum temperature of at least 120°F measured from the faucet throughout facility. [SA] Per PIC, no food preparation or warewashing will occur in this kitchen. Facility will provide extra utensils on this floor and utilize the warewashing station on other floors and until the 3-compartment sink is repaired. Technician was called during inspection to repair the water heater.

Pass Aug 2, 2025
100/100

ROUTINE INSPECTION

No reported violations