ROUTINE INSPECTION
Routine inspection was conducted on site and report was written off site. An exit interview was conducted with the operator to address the inspection findings. The OIR was issued to e-mail address that was verified onsite
1 reported violation
- K45: Floor, walls, ceilings: built,maintained, clean
Gap in the ceiling panel above the dry storage room. [CA] Repair holes in structure and maintain in good repair to prevent pest harborage.