93
Latest score
100%
Pass rate
2
Inspections
0
Critical violations

Location

View this restaurant on the map

Show interactive map

Latest inspection

PASSED
Dec 2, 2025ROUTINE INSPECTION256 days ago

Note: Food safety manager certificate: Leslie Brion - 1/9/2030

Inspection Timeline

Dec 2, 2025Latest
PassedScore: 93/100
ROUTINE INSPECTION
93
Jan 9, 2025
Passed
ROUTINE INSPECTION

Violations Analysis

0
Critical Violations
4
Non-Critical
4
Total Violations
Across 2 inspections

Complete inspection history

2 inspections
PassLatest Dec 2, 2025
93/100

ROUTINE INSPECTION

Note: Food safety manager certificate: Leslie Brion - 1/9/2030

3 reported violations
  • K21: Hot and cold water available

    The maximum water temperature on the manual three compartment wash sink was measured at 100 oF. [CA] Adjust the water heater temperature to raise the water temperature on the manual three compartments sink to 120 oF.

  • K47: Signs posted; last inspection report available

    The current Environmental Health permit was not posted on public view. [CA] The most current Environmental Health permit must be posted on public view at all the time. A copy of the most recent inspection report was not found on file. [CA] Copy of the most recent inspection report must be kept on file and should be given to anyone for review upon request.

  • K27: Food separated and protected

    An open bag sugar was stored on the remote storage room. [CA] Please do not store any open food products in the remote storage room. All open food products must be stored in properly labeled container inside the main station.

Pass Jan 9, 2025
N/A

ROUTINE INSPECTION

OWNERSHIP CHANGE INFORMATION NEW OWNER: GREAT MALL COFFEE AND BAKERY LLC NEW FACILITY NAME: GREGORY'S COFFEE The applicant has completed the change of ownership application process for an Environmental Health Permit. The permit category for this facility is FP12. An invoice for the permit fee in the amount of $896.00 will be mailed to the billing address on the application. Payment must be submitted within 10 days of receipt of the invoice. The owner is responsible for contacting our department if an invoice is not received and remit payment within 30 days. The Environmental Health Permit will be effective: 02/01/2025 - 01/31/2026. This report serves as a temporary permit. However, the permit will be deemed invalid if the permit fee is not paid in full within 30 days from the date of this report. Okay to Operate. Post permit in public view. Structural Review inspection conducted on 01/09/2025 Prior to the installation of any new equipment, submittal is required to Plan Check. Plan check consultation hours are Monday thru Friday 730AM-10AM and afternoon by appointment only at address above. Additional information on Plan Check Program is available at https://www.sccgov.org/sites/cpd/programs/pcp/Pages/home.aspx. Any installation of new equipment, without prior notification to district specialist/Plan Check is subject to impound. Unapproved equipment will not be allowed for use. *Obtain food safety manager certificate within 60 days. All other food employees must have valid food handler cards within 30 days from hire date. Food Safety Manager Certificate and Food Handler cards shall be available for review. Information on a Food Safety Certificate and Food Handler cards are available at https://www.sccgov.org/sites/cpd/programs/fsp/Pages/FSC.aspx. Facility shall notify district specialist should there be a change of number of employees or change in menu. District specialist shall be notified prior to the addition, replacement, or removal of any equipment. Facility is recommended to have professional pest control services.

1 reported violation
  • K48: Plan review

    Sidework Beverage Machine was not submitted to Plan Check. Intertek letter for site specific evaluation was provided. Cadco Convection Oven with attached vent shall be submitted to Plan Check. [CA] Prior to the installation of any new equipment, submittal is required to Plan Check for use.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.