ROUTINE INSPECTION
7 reported violations
- K40: Wiping cloths: properly used, stored
Observed wiping cloths stored on top of food preparation counters while not in use. [CA] Wiping towels shall be stored in sanitizing solution of an approved concentration when not in use (100 ppm - chlorine, 200 ppm - quaternary ammonium).
- K07: Proper hot and cold holding temperaturesCritical
Eggs next to stove measured 74F. Per PIC, they were brought out 1 hour and 15 min prior to temperature measurement. [CA] PHFs shall be held at 41°F or below or at 135°F or above. [COS] PIC returned the eggs to refrigeration.
- K06: Adequate handwash facilities supplied, accessible
Handwash sink by three compartment sink was blocked by plastic containers and plastic apron. [CA] Ensure that handwash sink remains available for use at all times during operation.
- K44: Premises clean, in good repair; Personal/chemical storage; Adequate vermin-proofing
Observed many pieces of unused equipment in facility. [CA] The premises of a food facility shall be free of litter and items that are unnecessary to the operation or maintenance of the facility, such as equipment that is nonfunctional or no longer used.
- K23: No rodents, insects, birds, or animals
Observed small black flies that appeared to be fruit flies in the back preparation area. [CA] Food facility shall be kept free of non-disease carrying insects, weevils, ants, gnats, and fruit flies.
- K30: Food storage: food storage containers identified
Observed many open containers of bulk food items throughout the facility. [CA] Store open bulk foods in approved NSF containers with tight fitting lids.
- K45: Floor, walls, ceilings: built,maintained, clean
Bakery preparation area has expanded to back area that does not have approved finished for food storage, food preparation etc. [CA] [CA] Ceilings of all rooms where nonprepackaged food is handled shall be smooth, of durable construction, and of nonabsorbent material that is easily cleanable. The floor surfaces shall be smooth, of durable construction, and of nonabsorbent material that is easily cleanable. Walls shall be of smooth, durable and easily cleanable material. Facility must submit plans to this department by 05/01/2026 to bring baking area into compliance. Facility must complete work by 07/01/2026.