ROUTINE INSPECTION
A new hot water heater and dish washing machine was installed. According to the employee this was submitted to the plan check unit for approval. The new equipment must be submitted for approval to this department. Please visit our website at ehinfo.org for the plan review process application.
2 reported violations
- K14: Food contact surfaces clean, sanitized
The inside upper panel of the ice machine has black accumulation on it. [CA] Thoroughly clean and sanitize the inside of the ice machine.
- K41: Plumbing approved, installed, in good repair; proper backflow devices
There is a drain pipe directly in the floor sink. [CA] Provide an air gap between the pipe and the top of the floor sink.