95
Latest score
100%
Pass rate
1
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Jan 14, 2026ROUTINE INSPECTION213 days ago

A new hot water heater and dish washing machine was installed. According to the employee this was submitted to the plan check unit for approval. The new equipment must be submitted for approval to this department. Please visit our website at ehinfo.org for the plan review process application.

Inspection Timeline

Jan 14, 2026Latest
PassedScore: 95/100
ROUTINE INSPECTION
95

Violations Analysis

0
Critical Violations
2
Non-Critical
2
Total Violations
Across 1 inspections

Complete inspection history

1 inspections
PassLatest Jan 14, 2026
95/100

ROUTINE INSPECTION

A new hot water heater and dish washing machine was installed. According to the employee this was submitted to the plan check unit for approval. The new equipment must be submitted for approval to this department. Please visit our website at ehinfo.org for the plan review process application.

2 reported violations
  • K14: Food contact surfaces clean, sanitized

    The inside upper panel of the ice machine has black accumulation on it. [CA] Thoroughly clean and sanitize the inside of the ice machine.

  • K41: Plumbing approved, installed, in good repair; proper backflow devices

    There is a drain pipe directly in the floor sink. [CA] Provide an air gap between the pipe and the top of the floor sink.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.