PassLatest Mar 13, 2025
100/100ROUTINE INSPECTION
Reviewed cooking temperature logs, cooling logs, and TPHC procedures. The report was written at the end of the site inspections and signed by the PIC. The PIC must ensure each food facility received a copy of the OIR.