FOLLOW-UP INSPECTION
On-site to conduct a follow-up inspection per facility request. Facility was closed on 11/14/2025 due to improper sewage disposal. The following major violation has been corrected: - K22: Sewage and wastewater improperly disposed. Verified that the water from the 3-compartment sink is now adequately draining and the grease trap does not overflow or leak. Per PIC, the grease trap was cleaned out this morning. Confirmed that all other sinks on-site are properly disposing wastewater. Facility is hereby authorized to re-open by this department. Continue to address remaining violations as cited on the routine inspection report.
1 reported violation
- K21: Hot and cold water available
Measured the maximum water temperature of the 3-compartment and preparation sinks at 116F. [CA] Hot water shall be supplied at a minimum of 120F as measured from the faucet at all times (100-108F at handwash stations).