FOLLOW-UP INSPECTION
Follow-up inspection to limited inspection conducted on 7/30/2026. The mechanical warewashing machine has been converted to chlorine based sanitizing. Measured the final chlorine sanitizing rinse at 50 ppm. Manager stated that the hot water booster needs to be replaced. Email inspector when replacement has been completed. PHF's outside of temperature control at the front cook line are held utilizing TPHC via time stickers. All hand wash sinks were fully stocked with soap and paper towels.