98
Latest score
100%
Pass rate
1
Inspections
0
Critical violations

Location

Latest inspection

PASSED
Mar 13, 2025ROUTINE INSPECTION520 days ago

Inspection Timeline

Mar 13, 2025Latest
PassedScore: 98/100
ROUTINE INSPECTION
98

Violations Analysis

0
Critical Violations
1
Non-Critical
1
Total Violations
Across 1 inspections

Complete inspection history

1 inspections
PassLatest Mar 13, 2025
98/100

ROUTINE INSPECTION

1 reported violation
  • K41: Plumbing approved, installed, in good repair; proper backflow devices

    Drain pipes from hand sink and dump sink extend into floor drain and past floor drain rim. [CA]: Provide 1 inch air gap between the mentioned water line outlet and the flood level rim of a floor drain.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.