95
Latest score
100%
Pass rate
2
Inspections
1
Critical violations

Location

Latest inspection

PASSED
Jun 19, 2026ROUTINE INSPECTION57 days ago

Inspection Timeline

Jun 19, 2026Latest
PassedScore: 95/100
ROUTINE INSPECTION
95
Oct 10, 2025
PassedScore: 89/100
ROUTINE INSPECTION
89

Violations Analysis

1
Critical Violations
1 in last 3 inspections
3
Non-Critical
4
Total Violations
Across 2 inspections

Complete inspection history

2 inspections
PassLatest Jun 19, 2026
95/100

ROUTINE INSPECTION

2 reported violations
  • K23: No rodents, insects, birds, or animals

    Rodent dropping observed on the work table, on the floor by the lockers, and water heater pan. [Corrective Action] Clean and sanitize affected areas.

  • K45: Floor, walls, ceilings: built,maintained, clean

    The ceiling panel above the water heater observed left slightly open. [Corrective Action] Ensure ceiling panel is completely closed.

Pass Oct 10, 2025
89/100

ROUTINE INSPECTION

2 reported violations
  • K06: Adequate handwash facilities supplied, accessibleCritical

    Lack of paper towels at the handwash sink in the restrooms. [Corrective Action] Ensure paper towels are always available to properly dry hands. [Corrected on Site] Paper towel dispenser refilled.

  • K21: Hot and cold water available

    1. Maximum hot water at the 3 compartment sink was measured at 106 degrees Fahrenheit. [Corrective Action] Provide minimum hot water temperature of 120 degrees Fahrenheit. 2. Warm water at the handwash sink was measured at 90 degrees Fahrenheit. [Corrective Action] Provide warm water at 100 - 108 degrees Fahrenheit.

Source: Santa Clara County open data. Records are supplied as-is and may take 24–48 hours to reflect a newly published inspection.